US Agency Reportedly Plans to Shut Down 8,000 EV Chargers, Offload EVs

Check out our latest products

Added to wishlistRemoved from wishlist 0
Add to compare
[K-Beauty] Rose Vitamin Oil to Foam | Daily Face Wash Oil Based Cleanser | Korean Rose Oil Foaming Face Cleanser | Hydrating Facial Cleanser for Dry Sensitive Skin (3.88 oz)
Added to wishlistRemoved from wishlist 0
Add to compare
$23.99
Added to wishlistRemoved from wishlist 0
Add to compare
100 Pieces Hand Palette makeup artist supplies Single Use Makeup Hand Palette Makeup Mixing Palette Makeup Artist Must Haves Transparent Waterproof Makeup Tape for Women (2.3 x 2.3 Inches)
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $5.48.Current price is: $4.48.
18%
Added to wishlistRemoved from wishlist 0
Add to compare
100% Grass Fed Beef Tallow for Skin Care – Face + Body – Whipped Moisturizer – Natural Lotion, 4 FL. oz. (Vanilla Latte)
Added to wishlistRemoved from wishlist 0
Add to compare
Original price was: $39.99.Current price is: $31.99.
20%

The General Services Administration (GSA), an agency that manages the federal government’s buildings, is planning to shut down all 8,000 of its electric vehicle chargers, The Verge reports.

The GSA is also expected to offload its current stock of EVs, though it’s unknown if the vehicles will be sold or put into storage. The agency will reportedly begin instructing employees to remove the chargers—which are used for both federally owned EVs and employees’ personal vehicles—as early as next week.

The agency informed employees at one regional office that, in its efforts “to align with the current administration,” it had received direction stating that all GSA-owned charging stations “are not mission-critical,” according to an email first reported by Colorado Public Radio.

“The GSA is working on the timing of canceling current network contracts that keep the EV chargers operational. Once those contracts are canceled, the stations will be taken out of service and ‘turned off at the breaker,’” the email continued. “Other chargers will be turned off starting next week.”

The web page dedicated to the electrification of the GSA’s fleet has also been taken offline, The Verge notes.

The GSA had been rapidly electrifying its fleet following the Biden administration’s 2021 executive order that calls for 100% of all federal fleet purchases to be zero-emission by 2035.

The news comes amid broader cuts to plans for a nationwide EV charging networks and measures to block the federal government from buying more electric vehicles.

Recommended by Our Editors

In January, President Donald Trump froze funds earmarked by the Biden administration for a nationwide EV charging network and revoked former President Biden’s 2021 executive order setting targets for EVs and emissions standards. He’s also openly expressed interest in cutting EV tax credits; thus far, he’s only said he’s “considering the elimination” of the credit.c

The GSA has yet to officially confirm the reports.

Get Our Best Stories!

Sign up for What’s New Now to get our top stories delivered to your inbox every morning.

This newsletter may contain advertising, deals, or affiliate links.
By clicking the button, you confirm you are 16+ and agree to our
Terms of Use and
Privacy Policy.
You may unsubscribe from the newsletters at any time.

Newsletter Pointer

About Will McCurdy

Contributor

Will McCurdy

I’m a reporter covering weekend news. Before joining PCMag in 2024, I picked up bylines in BBC News, The Guardian, The Times of London, The Daily Beast, Vice, Slate, Fast Company, The Evening Standard, The i, TechRadar, and Decrypt Media.

I’ve been a PC gamer since you had to install games from multiple CD-ROMs by hand. As a reporter, I’m passionate about the intersection of tech and human lives. I’ve covered everything from crypto scandals to the art world, as well as conspiracy theories, UK politics, and Russia and foreign affairs.

Read Will’s full bio

Read the latest from Will McCurdy




Added to wishlistRemoved from wishlist 0
Add to compare
(Pack of 2) Stainless Steel Round Food Ring Sunrise Kitchen Supply (2″ D x 1.5″H)
Added to wishlistRemoved from wishlist 0
Add to compare
$9.35
Added to wishlistRemoved from wishlist 0
Add to compare
(Pack of 2) Sunrise Kitchen Supply Heavy Duty 20 GaugeStainless Steel Deep Fryer Joining Strip/Connector (23″L x 1 1/2″W)
Added to wishlistRemoved from wishlist 0
Add to compare
$54.50

We will be happy to hear your thoughts

Leave a reply

Dust Particle
Logo
Compare items
  • Total (0)
Compare
0
Shopping cart